---
title: Changelog
summary: What changed in the framework, and when.
type: page
status: working
version: 0.1
updated: 2026-10-25
---

## v0.1 — 2026-10-25

- Rebuilt the site from scratch as Markdown files with structured front matter, readable by people and agents.
- Published five framework pages as a working draft: the problem space, the three loops, the well-informed space, cost of contact and the Triton method.
- Settled on three loops (discovery and design, develop and deploy, direct and define), with the 6Ds as their phases. Decided 2026-10-15.
- Added seven artifact skeletons from the 2010 activity spine.
- Moved the February–March 2024 pages to [Origins](/origins), unchanged, with their original dates.
- Still open: Deliver or Deploy, Design or Detail, and whether the well-informed space sits inside the DRF or underneath it.
